As a tribute to former late PM on his 104th birth anniversary, PM Narendra Modi on Monday opened the Bogibeel road-and-rail connector bridge in Assam. It is India’s longest and Asia’s second longest railroad bridge. The foundation of the bridge took place during former PM HD Deve Gowda’s tenure on January 22, 1997, and the work started on April 21, 2002, during Atal Ji’s government. The 4.94 km-long structure, situated across the Brahmaputra river, was built at an estimated cost of Rs. 5,900 crore. It surpassed its original budget of Rs. 3,200 crore and initially planned length of 4.31 km.

The Bogibeel Bridge is designed like a bridge which connects Sweden and Denmark. It is the only bridge in India which is fully-welded and follows the European codes and welding standards. The project required 19,250 meters of reinforcement steel and 30 lakh bags of cement. The engineers of the bridge say that this fully welded bridge has a low maintenance cost. As per the authorities, it has a lifespan of nearly 120 years.
The bridge will link Dibrugarh and Dhemaji districts of Assam, adjoining Arunachal Pradesh. Other than Assam’s Dibrugarh and Dhemaji districts, the bridge will greatly help the natives of the remote districts like Changlang, Tirap, Anjaw, Dibang Valley, Lohit and Lower Dibang Valley in Arunachal Pradesh.

The Bogibeel bridge has a 2-line railway track on the lower deck and a 3-lane road over the top deck. The travel time between Dibrugarh and Dhemaji districts will reduce by four hours, thus avoiding a 170-km detour. Also, Delhi-Dibrugarh train travel time will cut down by three hours.
Moreover, PM Modi also flagged off the train Tinsukia-Naharlagun Intercity Express that will operate five days in the week.

Having proximity to India-China border in Arunachal Pradesh, the Bogibeel bridge would also be crucial for India’s defense as it is sturdy enough to support the movement of tanks. Also the news agency PTI reports, three three road lanes of the bridge can serve as three landing strips for the Air Force’s fighter jets.

Speaking about the delay in the bridge construction, Chief Engineer Mohinder Singh told news agency PTI:
“Early flood in the river Brahmaputra restricted the working season to a very short period of approximately five months – from November to March – and demanded huge mobilization of construction equipment.”
At the bridge inauguration on Monday, PM Modi said:
“Corruption burdens the middle class and deprives poor of their rights. Our government has launched a fight against black money and corruption, and benami properties worth Rs 5,000 crore are confiscated.”
PM further added,
“Around Rs 3 lakh crore money from banks has been recovered which were hanging due to the earlier government.”
PM emphasized the NDA government’s involvement in the reforms for the past four and half years and said that the projects previously costing about Rs 12 lakh crore were either incomplete or had been delayed. He said,
“Our government has decided to finish these projects with a definite timeline.”
PM said that the bridge would transform the face of Northeast India,
“This 4.94-km long bridge will boost the defense sector in India, and help the economy of Assam and Arunachal Pradesh.”
He added,
“In four and half years, Bogibeel bridge is the third bridge that has been constructed over Brahmaputra, while in 70 years of Independence, only three bridges have come up over the river. The process of five more bridges has been initiated. Bogibeel is a tribute to former PM Atal Bihari Vajpayee.”
PM also stated about the government’s role in fast-tracking the project completion,
“We have changed the earlier ‘latkaane-bhatkaane’ (dilly-dallying) work culture… Completion of projects within a time frame is no longer confined to paper but has become a truth in the real sense.”
PM Modi also spoke about the other works done in Assam in the past four and half years. It included around 700 km-long national highways, electrification of railway tracks, an AIIMS in Assam work on the new airport terminal in Guwahati, and gas pipeline between Tinsukia and Guwahati have started. He also said that the bridge would reduce rail distance (between Dibrugarh in Assam to Naharlagun in Arunachal Pradesh) from 700 km to below 200 km.


